SEEPAGE OF WATER, HOLT LANE

Further to the ongoing problems with water seepage outside nos. 3 & 5 Holt Lane, I have now received the following update from the Operations Manager, Highways:

“I note that Yorkshire Water are again undertaking further investigatory works near the seepage, whilst I will seek confirmation of their findings, I have now decided that I will dig on the area of seepage, create a capture point and connect this into the surface water drainage near by.

I hope to instigate this as soon as we have all the service details over the next 8 – 10 weeks.”