RESURFACING OF THE GINNEL BETWEEN HOLT CLOSE AND OTLEY ROAD

I was very disappointed that no action had been taken by Highways to have this ginnel resurfaced as per their previous promise. I have been chasing Highways about this and have now received the following response from the Operations Manager:

“My apologies for the delay in responding, the Slurry Sealing contractor has been to look at this site and he has agreed this is (with minor preparation) suitable for his product.

The product is weather susceptible and therefore I am reluctant for this to be initiated until the slightly warmer weather arrives towards the end of March when the longevity of the product will be enhanced.”