STATE OF THE RECENT ROADWORKS ADEL VALE ROUND TO CHURCH LANE ALONG SIR GEORGE MARTIN DRIVE AND LONG CAUSEWAY

I have received a number of complaints about the quality of the finish and the workmanship on the recently resurfaced roads mentioned above. Set out below is the response I received from the Highways Engineer:

“I’ve inspected the surface dressing we’ve had done in the Adel area a good few times now . The roads mentioned have had a double layer of dressing and apart from a bit of stripping at the junction areas and a very small amount of loss of the top coat the roads are fine .

They will be revisited though for a quick defect visit at the end of our dressing programme.”